{"id":1568,"date":"2021-06-25T15:33:17","date_gmt":"2021-06-25T12:33:17","guid":{"rendered":"https:\/\/gmkas.com\/en\/?page_id=1568"},"modified":"2023-05-19T18:30:14","modified_gmt":"2023-05-19T15:30:14","slug":"maintenance-management","status":"publish","type":"page","link":"https:\/\/gmkas.com\/en\/maintenance-management\/","title":{"rendered":"MAINTENANCE MANAGEMENT"},"content":{"rendered":"<section class=\"wpb-content-wrapper\"><p>[vc_row][vc_column icons_position=&#8221;left&#8221;][vc_column_text]<\/p>\n<h2><strong>MILITARY INTEGRATED LOGISTICS MAINTENANCE MANAGEMENT<\/strong><\/h2>\n<p>It is the responsibility of developing a maintenance program that can support a system and then planning the detailed maintenance activities required. GMKA will be able to develop maintenance plans based on the data provided by subcontractors.<br \/>\nAfter the logistic analysis, GMKA will be able to deliver the planned maintenance system related to the system and its subsystems, and the printed delivery of the maintenance cards required for this system.<br \/>\nAfter analyses,<br \/>\n\u2022 Consumables,<br \/>\n\u2022 Hand tools,<br \/>\n\u2022 Special tools and equipment,<br \/>\nwhich are necessary for maintenance and repairs, can be identified.<\/p>\n<h5><strong>\u2022 MAINTENANCE MANAGEMENT AND PLANNING<\/strong><\/h5>\n<p>Physical Breakdown (Bill of Material-BOM) information of all systems, failure and troubleshooting methods, \u201cPreventive and Corrective Maintenance\u201d information and documents, determination of maintenance centers and maintenance planning and preparation of related documents.<\/p>\n<h5><strong>\u2022 PREPARATION OF MATERIAL AND STAFF DOCUMENTS<\/strong><\/h5>\n<p>Determination of the systems and devices in the platform configuration and the spare parts, test and hand tools, inventory material staff required for their operation and production of relevant documents.<\/p>\n<h5><strong>\u2022 IDENTIFICATION OF INITIAL SPARES<\/strong><\/h5>\n<p>Determining the initial spares required during the delivery of the platform and system to the user.<\/p>\n<h4><strong>PERFORMANCE BASED LOGISTICS (PBL)<\/strong><\/h4>\n<h5><strong>OUR GENERAL PBL APPROACH<\/strong><\/h5>\n<p>[\/vc_column_text][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column icons_position=&#8221;left&#8221;][vc_single_image image=&#8221;5294&#8243; img_size=&#8221;large&#8221; alignment=&#8221;center&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column icons_position=&#8221;left&#8221;][vc_column_text]Instead of supplying maintenance, training, data, documents and spare parts as part of traditional procurement by entering into long-term and separate logistics contracts (agreements), it is the approach to supply the specified performance criteria (reliability, operational readiness, cost, logistics trace, logistics time, etc.) with the most appropriate public-private cooperation.<\/p>\n<h5><strong>\u2022 WHAT IS PERFORMANCE BASED LOGISTICS?<\/strong><\/h5>\n<p>Raising awareness for culture change, determining the real needs of the end user, purchasing performance from the supplier rather than a single product, establishing long-term relationships, mutual risk sharing, taking up a program management perspective, each unit involved in the process focusing its own core competencies, communicating to the supplier not &#8220;how&#8221; but &#8220;what&#8221; is desired, focusing on life cycle, strategic and smart procurement, and creating added value.[\/vc_column_text][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column icons_position=&#8221;left&#8221;][vc_single_image image=&#8221;5295&#8243; img_size=&#8221;large&#8221; alignment=&#8221;center&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column icons_position=&#8221;left&#8221;][vc_column_text]<\/p>\n<h5><strong>\u2022 INTEGRATION OF LOGISTICS DISCIPLINES<\/strong><\/h5>\n<p>Maintenance, spare parts, technical documentation, special test and measurement tools, software, hardware, personnel, training, infrastructure, packaging-handling-transportation, configuration<\/p>\n<h5><strong>\u2022 OBSOLESCENCE MANAGEMENT<\/strong><\/h5>\n<p>Proactive approach, awareness, preparation, design, evaluation, analysis, implementation<\/p>\n<h5><strong>\u2022 MAINTENANCE MANAGEMENT<\/strong><\/h5>\n<p>Improvement in cost, effectiveness, flexibility, speed, technical and logistical times<\/p>\n<p>[\/vc_column_text][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243; icons_position=&#8221;left&#8221;][vc_column_text]<strong>Procurement<\/strong><br \/>\n-Contract management<br \/>\n-Determining support needs<br \/>\n-Support design (integration)<br \/>\n-Budget management<br \/>\n-LDA<br \/>\n-CRM<br \/>\n[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243; icons_position=&#8221;left&#8221;][vc_column_text]<strong>Service Introduction<\/strong><br \/>\n-Contract management<br \/>\n-Logistics database<br \/>\n-Technical documentation<br \/>\n-Initial spare determination<br \/>\n-Maintenance plans<br \/>\n-Spare part plans<br \/>\n-Personnel plans<br \/>\n-Infrastructure plans<br \/>\n-Test and evaluation<br \/>\n-Financial management<br \/>\n-CRM<br \/>\n[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243; icons_position=&#8221;left&#8221;][vc_column_text]<strong>Management<\/strong><br \/>\n-Contract management<br \/>\n-Obsolescence management<br \/>\n-Configuration management<br \/>\n-Logistics support analysis<br \/>\n-Document management<br \/>\n-Maintenance management<br \/>\n-Inventory management<br \/>\n-Spare parts management<br \/>\n-Personnel management<br \/>\n-Training<br \/>\n-Infrastructure management<br \/>\n-Budget management<br \/>\n-Financial management<br \/>\n-Warranty management<br \/>\n-CRM<br \/>\n[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column icons_position=&#8221;left&#8221;][vc_column_text]<\/p>\n<h5><strong>OUR PBL SERVICE SCOPE AND ADVANTAGES<\/strong><\/h5>\n<p>[\/vc_column_text][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column icons_position=&#8221;left&#8221;][vc_single_image image=&#8221;5299&#8243; img_size=&#8221;large&#8221; alignment=&#8221;center&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column icons_position=&#8221;left&#8221;][vc_column_text]<\/p>\n<h5><strong>MAINTENANCE PROJECT IN PBL<\/strong><\/h5>\n<p>\u2022 It is designed as a concrete step within the scope of PBL.<br \/>\n\u2022 It will be more effective and efficient with the maintenance of complex systems and implementation of private sector practices.<br \/>\n\u2022 A fast and flexible maintenance system will be attained.<br \/>\n[\/vc_column_text][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column icons_position=&#8221;left&#8221;][vc_single_image image=&#8221;5300&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][vc_empty_space hide_on_wide=&#8221;&#8221; hide_on_desktop=&#8221;&#8221; hide_on_notebook=&#8221;&#8221; hide_on_tablet=&#8221;&#8221; hide_on_mobile=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column icons_position=&#8221;left&#8221;][vc_column_text]<\/p>\n<h5><strong>MAINTENANCE SUPPORT-OUR CAPABILITIES<\/strong><\/h5>\n<p>\u2022 Gathering and analyzing the data of the device and material information applied, and presenting decision support information for future maintenance and repairs,<br \/>\n\u2022 Collecting and analyzing data on failure and repair activities, keeping failure statistics, modification and disposal, helping decision support ,<br \/>\n\u2022 Monitoring and reporting of changes within the framework of configuration and maintenance activities,<br \/>\n\u2022 Making document changes in maintenance and repair activities and possible modifications and configuration changes.<\/p>\n<h5><strong>GMKA AS PRODUCT SUPPORT INTEGRATOR;<\/strong><\/h5>\n<p>GMKA is ready to serve as a support provider with its competent human resources, experience and knowledge in analysis and decision support in matters such as:<br \/>\n\u2022 Providing consultancy services during the design phase of the envisaged structure,<br \/>\n\u2022 Preparing the contract,<br \/>\n\u2022 Operation of the supply processes within the scope of sustainment and maintenance,<br \/>\n\u2022 Preparation of the database,<br \/>\n\u2022 Information system creation and adaptation and integration of related software (ELD, IMS, stock, purchasing, accounting\u2026)<br \/>\n[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column icons_position=&#8221;left&#8221;][vc_column_text] MILITARY INTEGRATED LOGISTICS MAINTENANCE MANAGEMENT It is the responsibility of developing a maintenance program that can support a system and then planning the&hellip;<\/p>\n","protected":false},"author":1,"featured_media":2751,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/gmkas.com\/en\/wp-json\/wp\/v2\/pages\/1568"}],"collection":[{"href":"https:\/\/gmkas.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/gmkas.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/gmkas.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gmkas.com\/en\/wp-json\/wp\/v2\/comments?post=1568"}],"version-history":[{"count":15,"href":"https:\/\/gmkas.com\/en\/wp-json\/wp\/v2\/pages\/1568\/revisions"}],"predecessor-version":[{"id":5414,"href":"https:\/\/gmkas.com\/en\/wp-json\/wp\/v2\/pages\/1568\/revisions\/5414"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gmkas.com\/en\/wp-json\/wp\/v2\/media\/2751"}],"wp:attachment":[{"href":"https:\/\/gmkas.com\/en\/wp-json\/wp\/v2\/media?parent=1568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}